saw secondtonumb8 idea, digged in and found a smaller cup and handle. courrently running in a channel built from 2015(res) 2018(sup) the sucker is going up, will wait for break on res line of the cup, sl on the 50%of the channel(grey), might be thight, could be a good idea letting it breathe at entry somewhere in the yellow supp area. look at secondtonumb8 idea for a longer term perspective
註釋
as i always end doing, i ddn't wait for the re test and "panic bought".. don't be like warren be wise, wait for the perfect enteries..